EMR Track Record
No
Projects
Year
1.
Environmental Screening Study of the Proposed Northport-Westport Link for HSS Integrated S/B. The study consisted of a comprehensive data review, site inspection and reconnaissance surveys of selected key locations of potentially significant environmental concern along the proposed alignment of the link.
Responsisbility: Identifying sensitive fishery areas within the project vicinity, liaising with government departments & assisting in report production.
Jul 1996
2.
Ballast Water Risk Assessment desktop study on all main ports in Malaysia and Thailand for Queensland Port Authority. To determine the risk associated with foreign marine species (eg. unicellular organisms such as toxic dinoflagellates & cholera bacteria) can be introduced through ship’s ballast water.
Nov 1996
38.
Phase I Environmental Site Assessment & Limited Phase II at Sriram Industrial Enterprise Limited (SIEL) Hyderabad, India for Emerson Electric Co.
Dec 1996
4.
Preliminary Environmental Review for a proposed large alumina refinery in Bintulu, Sarawak for Comalco Aluminiam Limited.
Jan 1997
5.
Phase I Environmental Site Assessment at National Starch & Chemical (Thailand) Limited, Province of Kalasin, Thailand for Unilever.
Mar 1997
6.
Env. Screening Study for a Proposed Newsprint Mill for Malaysian Newsprint Industries S/B. The study focused on sites in N. Sembilan, Pahang & Selangor with emphasis on gas, water, nearest port and existing roads for transportation. Responsibility: Identifying sensitive fishery areas downstream & reviewing existing water quality status of rivers nearby to the screen sites.
Jan 1998
7.
Preliminary Site Assessment for the Proposed Silver Bird Factory in Nilai, Negeri Sembilan and Technical Environmental Report on the Existing Silver Bird Factory at Kuala Lumpur for Silver Bird Group Berhad.
Aug 2001
8.
Preliminary EIA for the Development of 200 acres Shrimp Mariculture (Tiger Prawn) at the Sg Dedap, Mukim Bukit Meriam, Kuala Muda, Kedah for MAX AQUATIC S/B.
May 2004
9.
Preliminary EIA for the Proposed Mixed Development (200 acres of Housing & Commercial), Seksyen U10, Shah Alam, Selangor for KUMPULAN LEBAR DAUN BERHAD
May 2004
10.
Preliminary EIA for the Proposed Development of Bio-Valley (600 acres of Tea & Herbs Plantation) at Lenggong, Perak Utara, Perak for SENIOR PARTNERS S/B.
May 2004
11.
Preliminary EIA for the “Cadangan Membina Dan Menyiapkan Kem Batalion 4 Pasukan Gerakan Am Semenyih Dan Sebuah Balai Polis Di Atas P.T. 3821, Mukim Semenyih, Daerah Hulu Langat, Selangor” for PEMBINAAN BLT S/B.
Feb 2006
12.
EIA for Crushing Plant for PROPOSED DEVELOPMENT ON LOTS 202, 236, 403, 516, 711, 712, 713, 714, 715, 761, 765, 980, 981, 982 & 983, Mukim 11, Daerah Barat Daya, Penang for SOUTHDOWNS CORPORATION SDN BHD.
Sept 2006
13.
EIA for Proposed Scheduled Waste Off-Site Facility at Kawasan Perindustrian Kundang, Rawang, Selangor for IOT PETROLEUM SDN BHD
July 2007
14.
PEIA for “Cadangan Merekabentuk, Membina & Menyiapkan Kem Ke 93 Depoh Pusat Peluru Di Mempaga, Bentong, Pahang untuk Kementerian Pertahanan M’sia” for TARGET RESOURCES S/B.
Dec 2007
15.
PEIA for the Proposed Housing & Commercial Development at Bukit Serai, Mukim Rawang, Daerah Gombak, S’gor for PERUNDING ARZEC.
Oct 2008
16.
Cdg. Merekabentuk, Membina & Menyiapkan Projek Akuakultur Estet Udang Laut Dikawasan Tmn Kekal Pengeluaran Makanan–Zon Industri Akuakultur, Kg. Tg. Batu, Nenasi, Pekan, Pahang.
Oct 2008
17.
PEIA for the Proposed Sand Dredging Off the Coast of Pulau Ketam, Selangor for JAY TEE HYDRO.
Dec 2008
18.
PEIA for the Proposed 1,000Ha Integrated Shrimp Aquaculture Park (iSHARP) in Setiu, Terengganu For BLUE ARCHIPELAGO BERHAD.
Jan 2009
19.
PEIA for the Proposed Sand Dredging Off the Coast of Tg. Piandang, Perak for JAY TEE HYDRO.
Mar 2009
20.
GOVERNMENT OFFICE BUILDING & EXTERNAL WORKS AT 4G8 – 411, P. 4, PUTRAJAYA.

Jun 2005

21.
490 UNIT RUMAH PANGSAPURI TERMASUK SEBUAH PIAZZA/TEMPAT LETAK KERETA 2 TKT., SURAU DAN DEWAN SERBAGUNA, PARCEL 15-12A, P. 15, PUTRAJAYA. Jun 2005
22.
8 BLOK APARTMEN (PARCEL 15-12B) –810 UNIT, SEBUAH SURAU DAN DEWAN SERBAGUNA,LETAK KERETA BERTINGKAT DI ATAS PLOT NO. 9850, P. 15.
Jun 2005
23.
303 UNIT RUMAH TERES 2 TINGKAT SELUAS 32.1 EKAR, P.15, PUTRAJAYA. Jun 2005
24.
PANGSAPURI KERAJAAN MENGANDUNGI :-I. 5 BLOK PANGSAPURI (379 UNIT) II. DEWAN SERBAGUNA III. 2 SUB BESMEN IV. HENTIAN BAS & TEKSI, 6R8, P. 6, PUTRAJAYA. Jun 2005
25.
DEVELOPMENT OF OFFICE BUILDING ON LOT 5G2, PRECINCT 5, PUTRAJAYA. Sept 2005
26.
PEMBANGUNAN 4 BLOK KEDAI PEJABAT 3 & 4 TKT (26’ X 85’) ZON 5, P. 11, PUTRAJAYA.

Jan 2006

27.
PERUMAHAN KERAJAAN DI ATAS PLOT 5R10, 9.755 EKAR, PRESINT 5, PUTRAJAYA . Apr 2006
28.
CDN. PEMBANGUNAN 8 UNIT KEDAI/PEJABAT 3-4 TKT, PLOT 9294, P 15, PUTRAJAYA.

May 2006

29.
SEBUAH PEJABAT JUALAN DAN RUMAH CONTOH UNTUK PROJEK PANGSAPURI KOS SEDERHANA RENDAH DI ATAS LOT PT4287 ZON 8C PRECINCT 11 FASA 2, PUTRAJAYA May2006
30.
43 UNIT RUMAH SESEBUAH (JENIS E), FASA 15-3 DI ATAS PLOT 9517 HINGGA 9522, 9543 HINGGA 9547 DAN 9774 HINGGA 9805 SELUAS 7.89 EKAR, P. 15. Jun 2006
31.
316 UNIT RUMAH BERKEMBAR 2 TINGKAT SELUAS 52.39 EKAR, P.15, PUTRAJAYA. Jun 2006
32.
CDN. PEMBANGUNAN 3 BLOK PANGSAPURI KERAJAAN MENGANDUNGI 362 UNIT KEDIAMAN BESERTA 3 ARAS LETAK KERETA (LOT 5R7), P. 5, PUTRAJAYA. Jun 2006
33.
CADANGAN PEMBANGUNAN 200 UNIT RUMAH BERKEMBAR 2 TINGKAT SELUAS 37.96 EKAR DI ATAS SEBAHAGIAN PT 1 & PT 50, PRESINT 15, PUTRAJAYA.. Jun 2006
34.
PEMBANGUNAN 21 UNIT RUMAH SESEBUAH (JENIS E), FASA 15-6 DAN 15-7, 8.94 EKAR DAN 45 UNIT RUMAH SESEBUAH (JENIS D), FASA 15-11, 16.47 EKAR, P. 15, PUTRAJAYA. July 2006
35.
PEMBANGUNAN 226 UNIT (ZON 12E) DAN 250 UNIT (ZON 12F), PANGSAPURI KOS SEDERHANA DI ATAS PT6924 DAN PT6925, PRESINT 11, PUTRAJAYA. July 2006
36.
PEMBANGUNAN 130 UNIT RUMAH KEMBAR 2 TKT, 18.445 EKAR, P. 15, PUTRAJAYA. Aug 2006
37.
CADANGAN PEMBANGUNAN 452 UNIT RUMAH TERES 2 TINGKAT, P. 15, PUTRAJAYA. Aug 2006
38.
PEMBANGUNAN KEDIAMAN 76 UNIT RUMAH TERES 2 & 21/2 TKT 5R8 & 40 UNIT RUMAH TERES 2 & 21/2 TKT 5R9, PRESINT 5, PUTRAJAYA.

Aug 2006

39.
PEMBANGUNAN BANGUNAN PENCAWANG MASUK UTAMA (132/33/11KV) DAN PONDOK PENGAWAL LOT PT 7529, P. 2, PUTRAJAYA UNTUK TENAGA NASIONAL BERHAD”. Feb 2007
40.
PENDIRIAN BANGUNAN BAGI GEREJA KATOLIK (5V7), PRESINT 5, PUTRAJAYA UNTUK TETUAN TITULAR ROMAN CATHOLIC ARCHBISHOP OF KUALA LUMPUR

Feb 2007

41.
CANAL DESILTING AT PRECINCT 18, CORE ISLAND, PUTRAJAYA. Aug 2008
42.
PENDIRIAN BANGUNAN KOMERSIAL KEDAI & SHOWROOM 3-4 TINGKAT DENGAN 1 ARAS BESMEN DAN KEDAI PEJABAT 3 TINGKAT(24’x 75’) DI ATAS PLOT P8C1 (CANTUMAN PLOT 8C1,8C2,TAMAN PENGHUBUNG DAN REZAB PARIT) P.8 (FASA 2), PUTRAJAYA.

Aug 2007

43.
EXCESS EARTH TRANSPORT FROM BOULEVARD SQUARE DEV. LOT 3C6, P. 3, TO PRECINCT 19,
PUTRAJAYA FOR AWANGSABINA S/B.
Jun 2008
44.
CDN. PEMBANGUNAN PEJABAT-KOMMERSIL 10 TINGKAT BESERTA 3 TKT. BASEMEN, DI ATAS PLOT 2C10 (PT 7551), PRESINT 2, WILAYAH PERSEKUTUAN PUTRAJAYA” FOR PUTRAJAYA HOLDINGS S/B Aug 2008
45.
“CDN. PEMBANGUNAN 119 UNIT APARTMENT DAN KEMUDAHAN2 AWAM YANG MENGANDUNGI: BLOK A1 (8 UNIT/3 TINGKAT) ; BLOK A2 (8 UNIT/3 TKT) ; BLOK A3 (8 UNIT/3 TKT) ; BLOK A4 (8 UNIT/3 TKT) ; BLOK B1 (44 UNIT/ 10 TKT) ; BLOK B2 (43 UNIT/10 TKT) DI ATAS PT NO. 9849, SELUAS 4.72 EKAR, P. 15, PUTRAJAYA FOR SETIA PUTRAJAYA DEVELOPMENT S/B. Aug 2008
46.
CADANGAN MEMBINA DAN MENYIAPKAN KOMPLEKS SEKOLAH MENGANDUNGI SEBUAH SEKOLAH MENENGAH KEBANGSAAN DAN SEBUAH SEKOLAH KEBANGSAAN DI ATAS PLOT 12953 DAN PLOT 12956, PRESINT 5, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK KEMENTERIAN PELAJARAN M’SIA. Sept 2008
47.
CDN. MEMBINA DAN MENYIAPKAN BANGUNAN PEJABAT DAN PERDAGANGAN DI ATAS PT 7546 (LOT 2C5), PRESINT 2, PUTRAJAYA” FOR PUTRAJAYA HOLDINGS S/B May 2009
48.
“CDN. PEMBANGUNAN KOMPLEKS KERAJAAN FASA 1 MENGANDUNGI 1 BLOK PEJABAT 13 TKT, 1 BLOK PEJABAT 11 TKT, 3 BLOK PEJABAT 8 TKT, 2 BLOK PEJABAT 6 TKT, 1 AUDITORIUM 4 TKT, ARAS PIAZZA 1 TKT, ARAS LALUAN DAN TEMPAT LETAK KERETA 1 TKT, ARAS BASEMEN 2 TKT, DAN JEJAMBAT DARI PARCEL F KE STESEN LRT DIATAS PARCEL F, PRESINT 1, PUTRAJAYA” FOR PUTRAJAYA HOLDINGS S/B. May 2009
49.
“CDN. PEMBANGUNAN 858 UNIT 6 BLOK PANGSAPURI – PARCEL 15-13, P. 15, PUTRAJAYA” FOR SETIA PUTRAJAYA DEVELOPMENT S/B. May 2009
50.
CDN. MEREKABENTUK, MEMBINA, MENYIAPKAN & MENTAULIAH LOJI RAWATAN KUMBAHAN ENAPCEMAR BERPUSAT “SEWAGE TREATMENT PLANT” STP 2 – MODULE 2 DI PRESINT 5, PUTRAJAYA” FOR SYARIKAT PERMODALAN KEBANGSAAN (SPK) BERHAD. Jun 2009