EIA Track Record
No
Projects
Year
1.
Environmental Screening Study of the Proposed Northport-Westport Link for HSS Integrated S/B. The study consisted of a comprehensive data review, site inspection and reconnaissance surveys of selected key locations of potentially significant environmental concern along the proposed alignment of the link.
Responsisbility: Identifying sensitive fishery areas within the project vicinity, liaising with government departments & assisting in report production.
Jul 1996
2.
Ballast Water Risk Assessment desktop study on all main ports in Malaysia and Thailand for Queensland Port Authority. To determine the risk associated with foreign marine species (eg. unicellular organisms such as toxic dinoflagellates & cholera bacteria) can be introduced through ship’s ballast water.
Nov 1996
3.
Phase I Environmental Site Assessment & Limited Phase II at Sriram Industrial Enterprise Limited (SIEL) Hyderabad, India for Emerson Electric Co.
Dec 1996
4.
Preliminary Environmental Review for a proposed large alumina refinery in Bintulu, Sarawak for Comalco Aluminiam Limited.
Jan 1997
5.
Phase I Environmental Site Assessment at National Starch & Chemical (Thailand) Limited, Province of Kalasin, Thailand for Unilever.
Mar 1997
6.
Env. Screening Study for a Proposed Newsprint Mill for Malaysian Newsprint Industries S/B. The study focused on sites in N. Sembilan, Pahang & Selangor with emphasis on gas, water, nearest port and existing roads for transportation. Responsibility: Identifying sensitive fishery areas downstream & reviewing existing water quality status of rivers nearby to the screen sites.
Jan 1998
7.
Preliminary Site Assessment for the Proposed Silver Bird Factory in Nilai, Negeri Sembilan and Technical Environmental Report on the Existing Silver Bird Factory at Kuala Lumpur for Silver Bird Group Berhad.
Aug 2001
8.
Preliminary EIA for the Development of 200 acres Shrimp Mariculture (Tiger Prawn) at the Sg Dedap, Mukim Bukit Meriam, Kuala Muda, Kedah for MAX AQUATIC S/B.
May 2004
9.
Preliminary EIA for the Proposed Mixed Development (200 acres of Housing & Commercial), Seksyen U10, Shah Alam, Selangor for KUMPULAN LEBAR DAUN BERHAD
May 2004
10.
Preliminary EIA for the Proposed Development of Bio-Valley (600 acres of Tea & Herbs Plantation) at Lenggong, Perak Utara, Perak for SENIOR PARTNERS S/B.
May 2004
11.
Preliminary EIA for the “Cadangan Membina Dan Menyiapkan Kem Batalion 4 Pasukan Gerakan Am Semenyih Dan Sebuah Balai Polis Di Atas P.T. 3821, Mukim Semenyih, Daerah Hulu Langat, Selangor” for PEMBINAAN BLT S/B.
Feb 2006
12.
EIA for Crushing Plant for PROPOSED DEVELOPMENT ON LOTS 202, 236, 403, 516, 711, 712, 713, 714, 715, 761, 765, 980, 981, 982 & 983, Mukim 11, Daerah Barat Daya, Penang for SOUTHDOWNS CORPORATION SDN BHD.
Sept 2006
13.
EIA for Proposed Scheduled Waste Off-Site Facility at Kawasan Perindustrian Kundang, Rawang, Selangor for IOT PETROLEUM SDN BHD
July 2007
14.
PEIA for “Cadangan Merekabentuk, Membina & Menyiapkan Kem Ke 93 Depoh Pusat Peluru Di Mempaga, Bentong, Pahang untuk Kementerian Pertahanan M’sia” for TARGET RESOURCES S/B.
Dec 2007
15.
PEIA for the Proposed Housing & Commercial Development at Bukit Serai, Mukim Rawang, Daerah Gombak, S’gor for PERUNDING ARZEC.
Oct 2008
16.
Cdg. Merekabentuk, Membina & Menyiapkan Projek Akuakultur Estet Udang Laut Dikawasan Tmn Kekal Pengeluaran Makanan–Zon Industri Akuakultur, Kg. Tg. Batu, Nenasi, Pekan, Pahang.
Oct 2008
17.
PEIA for the Proposed Sand Dredging Off the Coast of Pulau Ketam, Selangor for JAY TEE HYDRO.
Dec 2008
18.
PEIA for the Proposed 1,000Ha Integrated Shrimp Aquaculture Park (iSHARP) in Setiu, Terengganu For BLUE ARCHIPELAGO BERHAD.
Jan 2009
19.
PEIA for the Proposed Sand Dredging Off the Coast of Tg. Piandang, Perak for JAY TEE HYDRO.
Mar 2009